that likely sank while being towed across the Channel. Floating roads were towed in sections made up of three units. This multibeam echo sounder survey shows two metal gangways and three concrete floats, measuring a total of 90 m in length.
Survey DRASSM
Survey DRASSM
Vist the site : Maritime archaeology of the Normandy landings